DAY CLOSURES FRIDAY 11/21/2008 [27 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/21 09:15
landscaping 11/21 15:15
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/21 09:15
Street Rehab 11/21 15:15
1 NB/SB #1 2 EMERALD BAY ENT #1&2 - IRVINE COVE DR 11/21 09:01
Other check Remarks 11/21 15:01
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/21 09:01
Move Equipment 11/21 15:01
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/21 09:01
Move Equipment 11/21 15:01
5 N/A #3 3 OSO PARKWAY OC 55-509 - OSO PARKWAY OC 55-509 11/21 09:01
Other check Remarks 11/21 15:01
5 NB #1, #2 2 NB OFF TO ECR/AVE MENDO - NB ON ECR/AVE MENDOCINO 11/21 10:01
landscaping 11/21 14:01
5 NB #3 3 NB OFF TO SAND CYN AVE - NB OFF TO SAND CYN AVE 11/21 09:15
Other check Remarks 11/21 15:15
5 WB #3 3 NB ON FR SAND CYN AVE - SB OFF TO SAND CYN AVE 11/21 09:15
Other check Remarks 11/21 15:15
39 NB #3 3 TALBERT AVE - NEWMAN AVE 11/21 09:15
Paving 11/21 15:15
39 NB/SB #3 3 KATELLA AVE - CHESTER AVE 11/21 09:15
Other check Remarks 11/21 15:15
39 NB/SB #3 3 KATELLA AVE - KATELLA AVE 11/21 09:15
Dig Out 11/21 15:15
39 SB #1 3 ATLANTA AVE - JCT ST 1 11/21 09:15
Move Equipment 11/21 15:15
39 SB #3 3 STARK AVE - HEIL AVE 11/21 09:15
Other check Remarks 11/21 15:15
39 SB #1 3 200 north of gary Lane - 200 North of Gary lane 11/21 09:01
Electrical Repair 11/21 14:01
55 NB #1 2 NB OFF SANTIAGO / NOHL - NB OFF SANTIAGO / NOHL 11/21 09:01
Wash Out Repair 11/21 15:01
55 NB #1 2 NB OFF SANTIAGO / NOHL - NB OFF SANTIAGO / NOHL 11/21 09:01
Wash Out Repair 11/21 15:01
55 NB #1 2 NB OFF SANTIAGO / NOHL - NB OFF SANTIAGO / NOHL 11/21 09:01
Wash Out Repair 11/21 15:01
57 SB #1, #2 2 SB ON LAMBERT RD - LAMBERT RD UC 55-492 11/21 08:01
Paving 11/21 15:01
57 SB #1 3 END BR 55-504 - SB OFF LAMBERT RD 11/21 08:01
Paving 11/21 15:01
57 SB #1 3 SB OFF LAMBERT RD - SB OFF LAMBERT RD 11/21 08:01
Paving 11/21 15:01
73 SB #1 2 SB ON FORD/BONITA CNYN - SB OFF FORD/BONITA CNYN 11/21 07:01
Drainage 11/21 15:01


NIGHT CLOSURES FRIDAY 11/21/2008 [19 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #1 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 11/21 20:30
Paving 11/22 05:30
5 NB #1 1 NB ON FR ORANGETHORPE AV - NB ON FR ORANGETHORPE AV 11/21 23:01
Electrical Repair 11/22 05:01
5 NB #1, #2, #3 3 JCT 91 / 5 SEP OH 55-502R - ARTESIA AVE UC 55-139 11/22 00:30
Striping / Marking 11/22 05:01
5 NB #1, #2, #3 3 BROADWAY OC 55-615 - BROADWAY OC 55-615 11/21 23:01
Bridge Work 11/22 06:01
5 NB #1, #2, #3, Left HOV 4 END BR 55-227 - JCT 74 / 5 SEP 55-229 11/22 01:01
Bridge Work 11/22 05:01
5 NB #1, #2, Left HOV 5 BROOKHURST ST OC 55-89R - JCT 91 / 5 SEP OH 55-293L 11/21 22:01
Bridge Work 11/22 05:01
5 NB #1, #2, #3 3 SEG NB OFF TO NB BROADWY - SEG NB OFF TO NB BROADWY 11/21 23:01
Bridge Work 11/22 06:01
5 NB #1, Left HOV 4 END BR 55-227 - JCT 74 / 5 SEP 55-229 11/21 23:01
Bridge Work 11/22 06:01
5 NB #1 1 NB ON FR MANCHESTER / BCH - NB ON FR MANCHESTER / BCH 11/21 23:01
Electrical Repair 11/22 05:01
5 NB #1, #2, Left HOV 4 END BR 55-227 - JCT 74 / 5 SEP 55-229 11/21 23:45
Bridge Work 11/22 06:01
5 SB #1, #2 2 SB ON FR BEACH BLVD - SB ON FR BEACH BLVD 11/21 23:01
K-Rail 11/22 05:01
5 SB #1, #2, #3, Left HOV 4 JCT 74 / 5 SEP 55-229 - END BR 55-227 11/22 01:01
Bridge Work 11/22 05:01
5 SB #1, #2, Left HOV 4 JCT 74 / 5 SEP 55-229 - END BR 55-227 11/21 23:45
Bridge Work 11/22 06:01
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 11/21 23:01
K-Rail 11/22 05:01
5 SB #1, Left HOV 4 JCT 74 / 5 SEP 55-229 - END BR 55-227 11/21 23:01
Bridge Work 11/22 06:01
5 SB #1, #2, #3 3 SB ON ARTESIA AVE - JCT 91 / 5 SEP OH 55-502R 11/22 01:01
Bridge Work 11/22 05:01
91 WB #1, #2 2 WB 91 CONNECTOR TO NB RTE 5 - WB 91 CONNECTOR TO NB RTE 5 11/22 00:01
Bridge Work 11/22 05:01
261 NB #1, #2 2 BEGIN RTE AT WALNUT OC - JCT RTE 241 11/21 21:01
Paving 11/22 07:01
261 SB #1, #2 2 JCT RTE 241 - BEGIN RTE AT WALNUT OC 11/21 21:01
Electrical Repair 11/22 07:01


DAY CLOSURES SATURDAY 11/22/2008 [18 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/22 09:15
Street Rehab 11/22 15:15
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/22 09:15
landscaping 11/22 15:15
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/22 09:01
Move Equipment 11/22 15:01
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/22 09:01
Move Equipment 11/22 15:01
1 SB #3 3 TUSTIN AVE RT - DOVER DR RT / BAYSHORE LT 11/22 09:15
Move Equipment 11/22 15:15
5 N/A #3 3 OSO PARKWAY OC 55-509 - OSO PARKWAY OC 55-509 11/22 09:01
Other check Remarks 11/22 15:01
5 NB #3 3 NB OFF TO SAND CYN AVE - NB OFF TO SAND CYN AVE 11/22 09:15
Other check Remarks 11/22 15:15
5 WB #3 3 NB ON FR SAND CYN AVE - SB OFF TO SAND CYN AVE 11/22 09:15
Other check Remarks 11/22 15:15
39 NB #3 3 TALBERT AVE - NEWMAN AVE 11/22 09:15
Paving 11/22 15:15
39 NB #3 4 LAMBERT RD - MERCED AVE 11/22 08:01
Potholing 11/22 16:01
39 NB #3 3 JCT ST 1 - ADAMS AVE 11/22 07:15
Potholing 11/22 15:15
39 NB/SB #3 3 KATELLA AVE - KATELLA AVE 11/22 09:15
Dig Out 11/22 15:15
39 NB/SB #3 3 KATELLA AVE - CHESTER AVE 11/22 09:15
Other check Remarks 11/22 15:15
39 SB #1 3 ATLANTA AVE - JCT ST 1 11/22 09:15
Move Equipment 11/22 15:15
39 SB #1 3 200 north of gary Lane - 200 North of Gary lane 11/22 09:01
Electrical Repair 11/22 14:01
73 SB #1 2 SB ON FORD/BONITA CNYN - SB OFF FORD/BONITA CNYN 11/22 07:01
Drainage 11/22 15:01
90 EB #2, #3 3 BERRY ST LT / JASMINE DR - BREA CANYON CR 55-83 11/22 07:01
Paving 11/22 15:30
405 SB #1 1 SB HOV CONN TO SB RTE 5 - SB HOV CONN TO SB RTE 5 11/22 06:01
Bridge Work 11/22 14:01


NIGHT CLOSURES SATURDAY 11/22/2008 [12 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #1 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 11/22 20:30
Paving 11/23 05:30
5 NB #4 4 END BR 55-227 - JCT 74 / 5 SEP 55-229 11/22 23:01
Bridge Work 11/23 07:01
5 NB #3, #4 4 END BR 55-227 - JCT 74 / 5 SEP 55-229 11/22 23:45
Bridge Work 11/23 07:01
5 NB #3, #4 4 END BR 55-227 - JCT 74 / 5 SEP 55-229 11/22 23:45
Bridge Work 11/23 07:01
5 NB #1, #2 2 NB ON CAMINO CAPISTRANO - NB ON CAMINO CAPISTRANO 11/22 23:01
Bridge Work 11/23 07:01
5 NB #2, #3, #4 4 END BR 55-227 - JCT 74 / 5 SEP 55-229 11/23 01:01
Bridge Work 11/23 06:01
5 NB #1, #2, #3 3 SEG NB OFF TO NB BROADWY - SEG NB OFF TO NB BROADWY 11/22 23:01
Bridge Work 11/23 07:01
5 NB #1, #2, #3 3 BROADWAY OC 55-615 - BROADWAY OC 55-615 11/22 23:01
Bridge Work 11/23 07:01
5 NB #1, #2, #3 3 SEG NB OFF TO NB BROADWY - SEG NB OFF TO NB BROADWY 11/22 23:01
Bridge Work 11/23 07:01
22 EB #2, #3, #4 5 EUCLID ST UC 55-373 - EB OFF HARBOR BLVD 11/22 22:01
Bridge Work 11/23 08:01
22 EB #1 1 EB OFF HARBOR BLVD - 11/22 22:01
Bridge Work 11/23 08:01
22 EB #1, #2 2 WB ON EUCLID ST - 11/22 22:01
Bridge Work 11/23 08:01


DAY CLOSURES SUNDAY 11/23/2008 [17 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/23 09:15
landscaping 11/23 15:15
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/23 09:15
Street Rehab 11/23 15:15
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/23 09:01
Move Equipment 11/23 15:01
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/23 09:01
Move Equipment 11/23 15:01
5 N/A #3 3 OSO PARKWAY OC 55-509 - OSO PARKWAY OC 55-509 11/23 09:01
Other check Remarks 11/23 15:01
5 NB #3 3 NB OFF TO SAND CYN AVE - NB OFF TO SAND CYN AVE 11/23 09:15
Other check Remarks 11/23 15:15
5 WB #3 3 NB ON FR SAND CYN AVE - SB OFF TO SAND CYN AVE 11/23 09:15
Other check Remarks 11/23 15:15
22 EB #1, #2 2 EB OFF SB 5/MAIN/BROADWY - EB OFF TO NB 5 / NB 57 11/23 06:01
Cracksealing 11/23 11:01
22 EB #2 2 EB ON BRISTOL ST - EB ON BRISTOL ST 11/23 06:01
Cracksealing 11/23 11:01
22 WB #2 4 WB 22 MAIN ST ON RAMP - SEG OFF TO NB 5 / NB 57 11/23 06:01
landscaping 11/23 12:01
39 NB #3 3 JCT ST 1 - ADAMS AVE 11/23 07:15
Potholing 11/23 15:15
39 NB #3 4 LAMBERT RD - MERCED AVE 11/23 08:01
Potholing 11/23 16:01
39 NB #3 3 TALBERT AVE - NEWMAN AVE 11/23 09:15
Paving 11/23 15:15
39 NB/SB #3 3 KATELLA AVE - KATELLA AVE 11/23 09:15
Dig Out 11/23 15:15
39 NB/SB #3 3 KATELLA AVE - CHESTER AVE 11/23 09:15
Other check Remarks 11/23 15:15
39 SB #1 3 ATLANTA AVE - JCT ST 1 11/23 09:15
Move Equipment 11/23 15:15
73 SB #1 2 SB ON FORD/BONITA CNYN - SB OFF FORD/BONITA CNYN 11/23 07:01
Drainage 11/23 15:01


NIGHT CLOSURES SUNDAY 11/23/2008 [12 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #1 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 11/23 20:30
Paving 11/24 05:30
5 NB #1, #2 2 NB OFF TO STANTON/MNCHTR - NB OFF TO STANTON/MNCHTR 11/23 22:01
Striping / Marking 11/24 06:01
5 NB #1 1 NB ON FR ORANGETHORPE AV - NB ON FR ORANGETHORPE AV 11/23 23:01
Electrical Repair 11/24 05:01
5 NB #1 1 NB ON FR MANCHESTER / BCH - NB ON FR MANCHESTER / BCH 11/23 23:01
Electrical Repair 11/24 05:01
5 NB #1, #2, Left HOV 5 BROOKHURST ST OC 55-89R - JCT 91 / 5 SEP OH 55-293L 11/23 22:01
Bridge Work 11/24 05:01
5 NB #1, #2, #3 3 JCT 91 / 5 SEP OH 55-502R - ARTESIA AVE UC 55-139 11/23 23:30
Striping / Marking 11/24 04:01
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 11/23 23:01
K-Rail 11/24 05:01
5 SB #1, #2, #3 3 SB ON ARTESIA AVE - JCT 91 / 5 SEP OH 55-502R 11/24 00:01
Bridge Work 11/24 04:01
5 SB #1, #2 2 SB ON FR BEACH BLVD - SB ON FR BEACH BLVD 11/23 22:01
K-Rail 11/24 06:01
5 SB #1, #2, #3 3 SB ON ARTESIA AVE - JCT 91 / 5 SEP OH 55-502R 11/24 00:01
Bridge Work 11/24 04:01
55 NB #1, #2, #3, #4 4 SANTA ISABEL OC 55-662 - SB OFF TO MESA DR 11/24 00:01
Sign Installation 11/24 05:01
91 WB #1, #2 2 WB 91 CONNECTOR TO NB RTE 5 - WB 91 CONNECTOR TO NB RTE 5 11/23 23:01
Bridge Work 11/24 04:01


DAY CLOSURES MONDAY 11/24/2008 [21 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/24 09:15
landscaping 11/24 15:15
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/24 09:15
Street Rehab 11/24 15:15
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/24 09:15
Move Equipment 11/24 15:15
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/24 09:01
Move Equipment 11/24 15:01
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/24 09:01
Move Equipment 11/24 15:01
5 N/A #3 3 OSO PARKWAY OC 55-509 - OSO PARKWAY OC 55-509 11/24 09:01
Other check Remarks 11/24 15:01
5 NB #3 3 NB OFF TO SAND CYN AVE - NB OFF TO SAND CYN AVE 11/24 09:15
Other check Remarks 11/24 15:15
5 WB #3 3 NB ON FR SAND CYN AVE - SB OFF TO SAND CYN AVE 11/24 09:15
Other check Remarks 11/24 15:15
39 NB #3 3 TALBERT AVE - NEWMAN AVE 11/24 09:15
Paving 11/24 15:15
39 NB #3 4 LAMBERT RD - MERCED AVE 11/24 08:01
Potholing 11/24 16:01
39 NB #3 3 JCT ST 1 - ADAMS AVE 11/24 07:15
Potholing 11/24 15:15
39 NB/SB #3 3 KATELLA AVE - KATELLA AVE 11/24 09:15
Dig Out 11/24 15:15
39 NB/SB #3 3 KATELLA AVE - CHESTER AVE 11/24 09:15
Other check Remarks 11/24 15:15
39 SB #1 3 ATLANTA AVE - JCT ST 1 11/24 09:15
Move Equipment 11/24 15:15
39 SB #1 3 200 north of gary Lane - 200 North of Gary lane 11/24 09:01
Electrical Repair 11/24 14:01
55 NB #1 2 NB OFF SANTIAGO / NOHL - NB OFF SANTIAGO / NOHL 11/24 09:01
Wash Out Repair 11/24 15:01
73 SB #1 2 SB ON FORD/BONITA CNYN - SB OFF FORD/BONITA CNYN 11/24 07:01
Drainage 11/24 15:01
74 EB/WB Right Shoulder, Left Shoulder 1 SAN JUAN RD RT - END OF COUNTY 11/24 07:01
Drainage 11/24 16:30


NIGHT CLOSURES MONDAY 11/24/2008 [19 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #1 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 11/24 20:30
Paving 11/25 05:30
5 NB #1, #2, #3 3 JCT 91 / 5 SEP OH 55-502R - ARTESIA AVE UC 55-139 11/24 23:30
Striping / Marking 11/25 04:01
5 NB #1 1 NB ON FR ORANGETHORPE AV - NB ON FR ORANGETHORPE AV 11/24 23:01
Electrical Repair 11/25 05:01
5 NB #1, #2, Left HOV 5 BROOKHURST ST OC 55-89R - JCT 91 / 5 SEP OH 55-293L 11/24 22:01
Bridge Work 11/25 05:01
5 NB #1, #2 2 NB OFF TO STANTON/MNCHTR - NB OFF TO STANTON/MNCHTR 11/24 23:01
Striping / Marking 11/25 05:01
5 SB #1, #2 2 SB ON FR BEACH BLVD - SB ON FR BEACH BLVD 11/24 23:01
K-Rail 11/25 05:01
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 11/24 23:01
K-Rail 11/25 05:01
5 SB #1, #2, #3 3 SB ON ARTESIA AVE - JCT 91 / 5 SEP OH 55-502R 11/25 00:01
Bridge Work 11/25 04:01
55 NB #1, #2, #3, #4 4 SANTA ISABEL OC 55-662 - SB OFF TO MESA DR 11/25 00:01
Sign Installation 11/25 05:01
91 EB #1, #2 2 EB ON RAMP FROM MAGNOLIA AVE - EB ON RAMP FROM MAGNOLIA AVE 11/24 22:01
Bridge Work 11/25 04:01
91 EB #2, #3, #4 4 END BR 55-309 - BROOKHURST AV UC 55-280 11/24 23:45
Bridge Work 11/25 03:01
91 EB #3, #4 4 END BR 55-309 - BROOKHURST AV UC 55-280 11/24 23:01
Bridge Work 11/25 04:01
91 EB #4 4 END BR 55-309 - BROOKHURST AV UC 55-280 11/24 22:01
Bridge Work 11/25 04:01
91 WB #1, #2 2 WB 91 CONNECTOR TO NB RTE 5 - WB 91 CONNECTOR TO NB RTE 5 11/24 23:01
Bridge Work 11/25 04:01
91 WB #1, #2 2 WB ON RAMP FR BROOKHURST ST - WB ON RAMP FR BROOKHURST ST 11/24 22:01
Bridge Work 11/25 04:01
91 WB #2, #3, #4 4 BROOKHURST AV UC 55-280 - END BR 55-308 11/24 23:45
Bridge Work 11/25 03:01
91 WB #4 4 BROOKHURST AV UC 55-280 - END BR 55-308 11/24 22:01
Bridge Work 11/25 04:01
91 WB #3, #4 4 BROOKHURST AV UC 55-280 - END BR 55-308 11/24 23:01
Bridge Work 11/25 04:01
261 NB #1, #2 2 BEGIN RTE AT WALNUT OC - JCT RTE 241 11/24 21:01
Electrical Repair 11/25 05:01


DAY CLOSURES TUESDAY 11/25/2008 [20 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/25 09:15
landscaping 11/25 15:15
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/25 09:15
Street Rehab 11/25 15:15
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/25 09:01
Move Equipment 11/25 15:01
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/25 09:01
Move Equipment 11/25 15:01
5 N/A #3 3 OSO PARKWAY OC 55-509 - OSO PARKWAY OC 55-509 11/25 09:01
Other check Remarks 11/25 15:01
5 NB #1, #2 2 NB ON ECR/AVE MENDOCINO - NB ON ECR/AVE MENDOCINO 11/25 10:01
landscaping 11/25 14:01
5 NB #3 3 NB OFF TO SAND CYN AVE - NB OFF TO SAND CYN AVE 11/25 09:15
Other check Remarks 11/25 15:15
5 WB #3 3 NB ON FR SAND CYN AVE - SB OFF TO SAND CYN AVE 11/25 09:15
Other check Remarks 11/25 15:15
39 NB #3 3 TALBERT AVE - NEWMAN AVE 11/25 09:15
Paving 11/25 15:15
39 NB #3 3 JCT ST 1 - ADAMS AVE 11/25 07:15
Potholing 11/25 15:15
39 NB/SB #3 3 KATELLA AVE - CHESTER AVE 11/25 09:15
Other check Remarks 11/25 15:15
39 NB/SB #3 3 KATELLA AVE - KATELLA AVE 11/25 09:15
Dig Out 11/25 15:15
39 SB #1 3 ATLANTA AVE - JCT ST 1 11/25 09:15
Move Equipment 11/25 15:15
39 SB #1 3 200 north of gary Lane - 200 North of Gary lane 11/25 09:01
Electrical Repair 11/25 14:01
55 NB #1 2 NB OFF SANTIAGO / NOHL - NB OFF SANTIAGO / NOHL 11/25 09:01
Wash Out Repair 11/25 15:01
73 SB #1 2 SB ON FORD/BONITA CNYN - SB OFF FORD/BONITA CNYN 11/25 07:01
Drainage 11/25 15:01
74 EB/WB Right Shoulder, Left Shoulder 1 SAN JUAN RD RT - END OF COUNTY 11/25 07:01
Drainage 11/25 16:30


NIGHT CLOSURES TUESDAY 11/25/2008 [12 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #1 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 11/25 20:30
Paving 11/26 05:30
55 NB #1, #2, #3, #4 4 SANTA ISABEL OC 55-662 - SB OFF TO MESA DR 11/26 00:01
Sign Installation 11/26 05:01
91 EB #4 4 END BR 55-309 - BROOKHURST AV UC 55-280 11/25 22:01
Bridge Work 11/26 04:01
91 EB #3, #4 4 END BR 55-309 - BROOKHURST AV UC 55-280 11/25 23:01
Bridge Work 11/26 04:01
91 EB #1, #2 2 EB ON RAMP FROM MAGNOLIA AVE - EB ON RAMP FROM MAGNOLIA AVE 11/25 22:01
Bridge Work 11/26 04:01
91 EB #1, #2 2 EB ON RAMP FROM MAGNOLIA AVE - EB ON RAMP FROM MAGNOLIA AVE 11/25 22:01
Bridge Work 11/26 04:01
91 EB #2, #3, #4 4 END BR 55-309 - BROOKHURST AV UC 55-280 11/25 23:45
Bridge Work 11/26 03:01
91 WB #4 4 BROOKHURST AV UC 55-280 - END BR 55-309 11/25 22:01
Bridge Work 11/26 04:01
91 WB #2, #3, #4 4 BROOKHURST AV UC 55-280 - END BR 55-309 11/25 23:45
Bridge Work 11/26 03:01
91 WB #3, #4 4 BROOKHURST AV UC 55-280 - END BR 55-309 11/25 23:01
Bridge Work 11/26 04:01
91 WB #1, #2 2 WB ON RAMP FR BROOKHURST ST - WB ON RAMP FR BROOKHURST ST 11/25 22:01
Bridge Work 11/26 04:01
261 NB #1, #2 2 BEGIN RTE AT WALNUT OC - JCT RTE 241 11/25 21:01
Electrical Repair 11/26 05:01


DAY CLOSURES WEDNESDAY 11/26/2008 [20 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/26 09:15
landscaping 11/26 15:15
1 NB #3 3 MAIN ST RT / HUNTBCH PIER - 6 TH ST RT OID 11/26 09:15
Street Rehab 11/26 15:15
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/26 09:01
Move Equipment 11/26 15:01
1 SB #2 2 5TH AVE RT - 8TH AVE RT 11/26 09:01
Move Equipment 11/26 15:01
5 N/A #3 3 OSO PARKWAY OC 55-509 - OSO PARKWAY OC 55-509 11/26 09:01
Other check Remarks 11/26 15:01
5 NB #1, #2 2 NB ON ECR/AVE MENDOCINO - NB ON ECR/AVE MENDOCINO 11/26 10:01
landscaping 11/26 14:01
5 NB #3 3 NB OFF TO SAND CYN AVE - NB OFF TO SAND CYN AVE 11/26 09:15
Other check Remarks 11/26 15:15
5 WB #3 3 NB ON FR SAND CYN AVE - SB OFF TO SAND CYN AVE 11/26 09:15
Other check Remarks 11/26 15:15
39 NB #3 3 TALBERT AVE - NEWMAN AVE 11/26 09:15
Paving 11/26 15:15
39 NB #3 3 JCT ST 1 - ADAMS AVE 11/26 07:15
Potholing 11/26 15:15
39 NB/SB #3 3 KATELLA AVE - CHESTER AVE 11/26 09:15
Other check Remarks 11/26 15:15
39 NB/SB #3 3 KATELLA AVE - KATELLA AVE 11/26 09:15
Dig Out 11/26 15:15
39 SB #1 3 ATLANTA AVE - JCT ST 1 11/26 09:15
Move Equipment 11/26 15:15
39 SB #1 3 200 north of gary Lane - 200 North of Gary lane 11/26 09:01
Electrical Repair 11/26 14:01
57 SB #1, #2 2 SB ON LAMBERT RD - LAMBERT RD UC 55-492 11/26 08:01
Paving 11/26 15:01
57 SB #1 3 SB OFF LAMBERT RD - SB OFF LAMBERT RD 11/26 08:01
Paving 11/26 15:01
57 SB #1 3 END BR 55-504 - SB OFF LAMBERT RD 11/26 08:01
Paving 11/26 15:01
73 SB #1 2 SB ON FORD/BONITA CNYN - SB OFF FORD/BONITA CNYN 11/26 07:01
Drainage 11/26 15:01


NIGHT CLOSURES WEDNESDAY 11/26/2008 [1 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period


DAY CLOSURES THURSDAY 11/27/2008 [19 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period


NIGHT CLOSURES THURSDAY 11/27/2008 [1 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period


Continuous Closures [ 8 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 07/31 05:01
Bridge Work 07/31 05:01
74 EB/WB #1 2 LAZY W RANCH RD-LT - END OF COUNTY 02/20 04:30
Other check Remarks 12/26 20:30
74 EB/WB #1 2 LAZY W RANCH RD-LT - END OF COUNTY 02/20 04:30
Other check Remarks 12/26 20:30
74 N/A #1 2 LAZY W RANCH RD-LT - END OF COUNTY 02/20 04:30
Other check Remarks 12/26 20:30
74 EB/WB #1 2 LAZY W RANCH RD-LT - END OF COUNTY 02/20 20:30
Other check Remarks 12/26 04:30
74 N/A #1 2 LAZY W RANCH RD-LT - END OF COUNTY 02/20 04:30
Other check Remarks 12/26 20:30
39 SB #1 3 ATLANTA AVE - **RTE001 SEQ 0009301** 06/09 09:15
Move Equipment 12/15 15:15
261 NB Right Shoulder 2 NB ON FR PORTOLA PKWY - UTILITY UC 55-896R 11/18 05:01
Drainage 12/12 07:01